Projects in Europe

Glass chapel greenhouse Portugal

Portugal

Chapel greenhouse with glass roof in Portugal, the most durable and high light-transmission solution for high-quality production.

10 m

bay width

Glass

cover

2022

year of execution

Portugal

location

Maximum durability
and light transmission.

In 2022, Fertri carried out this chapel greenhouse with a glass roof in Portugal. The chapel type with glass represents the solution with the greatest longevity and optical quality within the Fertri greenhouse catalogue: horticultural glass offers higher light transmission than plastic, maintains its properties unchanged for decades and does not require periodic cover replacement, significantly reducing long-term maintenance costs.

The 10-metre width of this glass chapel greenhouse provides a spacious, open interior optimised for intensive horticultural crops in substrate or soil. Fertri’s galvanised metal structure is specifically designed to withstand the additional weight of glass compared with plastics, with reinforced sections in posts and purlins.

Portugal’s proximity to Fertri’s manufacturing plant in Pontedeume enabled fast road transport, with very tight delivery times and on-site coordination.

Project sheet
Country 🇵🇹 Portugal
Year 2022
Type Glass chapel greenhouse
Bay width 10 m
Cover Horticultural glass
Structure Reinforced galvanised steel
Modality Turnkey

Equipment included

 

Horticultural glass cover

4 mm tempered glass with high light transmission and durability of over 30 years.

 

Roof and side ventilation

Automatic opening for interior climate control in all seasons of the year.

 

Drip irrigation

Localised irrigation system with automated programming and nutrient dosing.

Execution phases

Technical study and design

Reinforced structural calculation to support the weight of the glass under all climate loads.

Manufacturing in Pontedeume

Manufacture of the galvanised structure and preparation of the glazing profiles.

Road transport

Direct shipment from A Coruña to Portugal, with glass supplied locally to reduce breakage.

Assembly and glass installation

Specialised Fertri technical team for fitting and sealing the glass cover.

 Project delivered

In production since 2022.