Production multi-tunnel 25,000 m² · Alicante
Multi-tunnel horticultural production installation in eastern Spain. An 8-metre-wide structure with roof ventilation and automated irrigation system.
25.000
m² built
8 m
bay width
2022
year of execution
Spain
location
Horticultural production
in eastern Spain.
In 2022, Fertri completed this 25,000 m² multi-tunnel installation in the province of Alicante, one of Spain’s most active horticultural areas. The structure, with 8-metre-wide bays, was designed to maximise vegetable production under cover, taking advantage of the favourable climatic conditions of eastern Spain.
The project includes a motorised roof ventilation system that enables precise management of the interior microclimate, essential during the months of highest solar radiation. The drip irrigation installation with automated fertigation guarantees exact dosing of water and nutrients at every stage of the crop.
Execution was carried out in close coordination with the client’s technical team, adapting the structural design to the plot’s topography and the specific requirements of the crop.
Project sheet
| Country | 🇪🇸 Spain |
| Region | Alicante |
| Year | 2022 |
| Type | Multi-tunnel |
| Surface area | 25.000 m² |
| Bay width | 8 m |
| Cover | Thermal PE |
| Modality | Turnkey |
Equipment included
Drip irrigation + fertigation
Automated head unit with sector programming and integrated nutrient dosing.
Motorised roof ventilation
Automatic opening by temperature and humidity. Control integrated into the climate system.
Thermal screens
Reduction of night-time heat losses with motorised operation.
Execution phases
Technical study and design
Topographic analysis, structural calculation and installation design adapted to Alicante’s climatic conditions.
Manufacturing in Pontedeume
Galvanised steel profiles manufactured at Fertri’s plant in A Coruña.
Transport and assembly
Transfer of materials and on-site assembly with Fertri’s technical team.
Project delivered
Installation completed and in production since 2022.